Home
Services
Drum Trailers
Rail infrastructure
Fruit crop
Special constructions
News
Contact
Rail infrastructure - MDV unit
« Back to Rail infrastructure
Request information
Name:
E-mail:
Phone:
Comments:
Baveck
Mechanical sleeper renewal unit for spreading gravel between the railway track. The MDV unit is equipped with a rotating sleeper grab which enables sleeper replacement without disassembling the railway track.
Images from 'MDV unit'
Services
»
» Hose presses / Hydraulics
» Machining
» Sheet metal work
» Construction services
» Machine paint work
» Maintenance machines
»
Products
HW2000MX
emulsion unit
Rail frame extension
Hydraulic sleeper grab
Rail car
Self-propelled rig
HW3500MX2
Filling unit
Overhead line reel unit
HW2800 MX
HW15.000MX
HW35.000
Flatlorry
HW13.000MX
emulsion boiler with motor driven agitator
HW18.000DA
Ballast pusher
Rust removing brush
Extendable low-bed trailer
Cable winch puller
Baveck cable transporter 7 kN
Rail clamp hydraulic
HW6000MX
Containerlorry
Compact, robust rail lifter
Rail welding vehicle
Split spreader
MDV unit
Container clamp
References